Process

The lighting design process: six phases, one point of contact

How a lighting design project works at AK Lichtdesign, from the first look at your plans to the programmed lighting scenes.

Printed lighting plan on the meeting table in the AK Lichtdesign studio

In short

A lighting design project at AK Lichtdesign runs in six phases: initial meeting and plan review, lighting design proposal, design concept and presentation, construction drawings, lighting equipment proposal and site support. One point of contact remains responsible until the light beams are aimed and the lighting scenes are programmed.

The six phases

What happens in each phase

The process comes from practice: this is how, for example, the lighting design for a new build with a double garage and grounds in the Ortenau region was carried out.

  1. 1

    Initial meeting and plan review

    We talk about your project, review the architectural and interior design plans and give you a first assessment. The starting point is the free project call.

  2. 2

    Lighting design proposal

    The scope is defined per room and area, for example basement, ground floor, upper floor and outdoor areas. The proposal also lists the documents we need for the design.

  3. 3

    Design concept and presentation

    Goals for the lighting moods in line with the interior, a review of the daylight conditions, lighting layers from ambient light to decorative luminaires and accent lighting through to mood and indirect light, quantities and an estimate of the material costs. The lighting concept is presented in 2D and, depending on the project, with lighting calculations and 3D visualisations.

  4. 4

    Construction drawings

    Detailed drawings positioning the lighting equipment, switching and dimming groups for lighting control, your requests incorporated and, on request, sockets marked. This is the basis for the electrical planner and the electrician.

  5. 5

    Lighting equipment proposal

    The specified luminaires come from a single source, as original products, with quantity and budget control.

  6. 6

    Site support

    Delivery coordination, coordination with everyone involved on site and the final acceptance: we aim the light beams and programme the lighting scenes.

What we need from you

Documents for the call and the design

For the project call

  • Floor plans or photos
  • Current project stage
  • Your questions

For the lighting design

  • Floor plans and elevations
  • Interior design concept with material and colour specifications for floor, ceiling and walls
  • Furnishing concept

Frequently asked questions

Questions about the process

How many phases does a lighting design project have?

Six: initial meeting and plan review, lighting design proposal, design concept and presentation, construction drawings, lighting equipment proposal and site support.

When should lighting design start?

Before the electrical plan is fixed. The construction drawings from phase 4 are the basis for the electrical planner and the electrician.

Do I have to commission all phases?

No. The scope is defined in the lighting design proposal. Depending on your requirements, we can offer individual services or all phases from a single source.

What do I get in the design concept presentation?

Goals for the lighting moods, the lighting layers from ambient to mood lighting, quantities and an estimate of the material costs, as a 2D presentation and, depending on the project, with lighting calculations and 3D visualisations.